Saturday, March 21, 2026
  • About us
    • Write for us
    • Disclaimer
    • Terms of use
    • Privacy Policy
  • RSS Feeds
  • Advertise with us
  • Contact us
DefenceTalk
  • Home
  • Defense News
    • Defense & Geopolitics News
    • War Conflicts News
    • Army News
    • Air Force News
    • Navy News
    • Missiles Systems News
    • Nuclear Weapons
    • Defense Technology
    • Cybersecurity News
  • Military Photos
  • Defense Forum
  • Military Videos
  • Military Weapon Systems
    • Weapon Systems
    • Reports
No Result
View All Result
  • Home
  • Defense News
    • Defense & Geopolitics News
    • War Conflicts News
    • Army News
    • Air Force News
    • Navy News
    • Missiles Systems News
    • Nuclear Weapons
    • Defense Technology
    • Cybersecurity News
  • Military Photos
  • Defense Forum
  • Military Videos
  • Military Weapon Systems
    • Weapon Systems
    • Reports
No Result
View All Result
DefenceTalk
No Result
View All Result
Home Defence & Military News Army News

TERRIER Engineer Vehicle Passes Two Key Milestones

by BAE Systems
February 23, 2010
in Army News
2 min read
0
14
VIEWS

NEWCASTLE, UK: The BAE Systems’ program to deliver 60 TERRIER vehicles to the British Army has taken two important steps forward.

Manufacture of the first TERRIER production hull began on 27 January at the company’s Newcastle plant. In a ceremony attended by senior staff from both the MoD Combat Wheels Group and BAE Systems’ suppliers; visitors saw machining operations on the first side plate commence.

Attendees at the production launch ceremony were able to see first hand the £2m investment in process and machinery which has been put in place to support Terrier production. Both have been completely overhauled to improve build efficiency and maximise build quality, following lessons learnt from production of the heavier Titan and Trojan engineer vehicles, and the mine-protected Panther command and liaison vehicle which was recently delivered to Afghanistan.

The first TERRIER hull will be used in mine blast trials to demonstrate improved protection levels introduced by modifications resulting from experience gained on other vehicles during operations in Iraq and Afghanistan. The complete hull will be available for trials towards the end of this year. Assembly, integration and test of the first production vehicle is scheduled to commence in the first half of 2011.

Another important TERRIER development milestone was successfully completed in December 2009 after two demonstrator vehicles finished a comprehensive performance trial designed to demonstrate reliability growth.

This two-month assessment consisted of a range of typical battlefield missions, including:

  • Travelling 3,300 km, split between road, track and cross country going
  • Excavating 135 pits for Warrior infantry fighting vehicles
  • Digging 39 pits for AS 90 self-propelled howitzers
  • Moving 15,500 tonnes of spoil
  • Operating the vehicles remotely via a remote control system and radio link
  • Completing a range of route clearance and denial operations and placement of ditch-crossing fascines.

BAE Systems TERRIER team leader Paul Dale explained, “Our goal with these trials is to provide the Ministry of Defence with confidence that TERRIER is on track to meet the exacting reliability levels prescribed for the vehicle.”

Following a detailed review of the trial results and subsequent reliability case report, the MoD has concluded that the trial has been successful and the programme should continue to the next phase of reliability growth, which is to demonstrate compliance with the full contractual reliability requirement.

Group Captain Paul Ridge, the leader of the Manoeuvre Support Team responsible for the Terrier project, added “The successful completion of the mid-point reliability trials and the start of first production hull are significant milestone achievements for both BAE Systems and MoD. While there remain challenges ahead of us, both teams are committed to building on the momentum and recent successes to deliver world class capability and reliability for the Royal Engineers”.

Paul Dale concluded: “The reliability targets set within the TERRIER contract represent a significant increase over the reliability requirements associated with Armoured Fighting Vehicles currently in service with the British Army. In successfully completing the performance trial, TERRIER has demonstrated a step improvement in reliability beyond that seen during the early phases of the programme.”

BAE Systems is a global defense, security and aerospace company with approximately 107,000 employees worldwide. The Company delivers a full range of products and services for air, land and naval forces, as well as advanced electronics, security, information technology solutions and customer support services. In 2009 BAE Systems reported sales of £22.4 billion (US$ 36.2 billion).

Tags: british armyengineerTerrier Vehicles
Previous Post

Chief of Staff Highlights Importance of Space to Air Force Mission

Next Post

Army Technology Live debuts free iPhone app

Related Posts

Indonesia Orders Additional CAESAR Artillery Systems

France to send more mobile artillery to Ukraine

February 1, 2023

France will ship 12 more Caesar truck-mounted howitzers and fresh air defence equipment to Ukraine to bolster the fight against...

Leopard tanks to arrive in Ukraine around late March: Germany

Leopard tanks to arrive in Ukraine around late March: Germany

January 27, 2023

Leopard tanks pledged by Germany to help Ukraine repel Russia's invasion will arrive in "late March, early April", Defence Minister...

Next Post

Army Technology Live debuts free iPhone app

Latest Defense News

US needs top cyber coordinator, better hacker ‘deterrence’

‘Digital fog of war’ around Iranian cyberattacks

March 13, 2026
US military says aircraft crash in Iraq killed 4 crew members

US military says aircraft crash in Iraq killed 4 crew members

March 13, 2026
Northrop Grumman moves to boost B-21 Raider output

Northrop Grumman moves to boost B-21 Raider output

March 13, 2026
US Navy evacuates virus-struck aircraft carrier Roosevelt

US military ‘not ready’ to escort tankers through Hormuz Strait

March 12, 2026
Israel cancels leave for combat units after Iran consulate strike

US says Iran campaign cost $11 billion in six days

March 12, 2026
US moves closer to retaliation over hacking as cyber woes grow

Cyberattack Disrupts Operations at MedTech Giant Stryker

March 11, 2026

Defense Forum Discussions

  • Indonesian Aero News
  • Marine Nationale (French Navy)
  • Middle East Defence & Security
  • Royal Australian Navy Discussions and Updates 2.0
  • The Russian-Ukrainian War Thread
  • F-35 Program - General Discussion
  • Royal Australian Air Force [RAAF] News, Discussions and Updates
  • German Navy
  • International Army News Thread
  • KAI KF-21
DefenceTalk

© 2003-2020 DefenceTalk.com

Navigate Site

  • Defence Forum
  • Military Photos
  • RSS Feeds
  • About us
  • Advertise with us
  • Contact us

Follow Us

No Result
View All Result
  • Home
  • Defense News
    • Defense & Geopolitics News
    • War Conflicts News
    • Army News
    • Air Force News
    • Navy News
    • Missiles Systems News
    • Nuclear Weapons
    • Defense Technology
    • Cybersecurity News
  • Military Photos
  • Defense Forum
  • Military Videos
  • Military Weapon Systems
    • Weapon Systems
    • Reports

© 2003-2020 DefenceTalk.com