Wednesday, November 11, 2026
  • About us
    • Write for us
    • Disclaimer
    • Terms of use
    • Privacy Policy
  • RSS Feeds
  • Advertise with us
  • Contact us
DefenceTalk
  • Home
  • Defense News
    • Defense & Geopolitics News
    • War Conflicts News
    • Army News
    • Air Force News
    • Navy News
    • Missiles Systems News
    • Nuclear Weapons
    • Defense Technology
    • Cybersecurity News
  • Military Photos
  • Defense Forum
  • Military Videos
  • Military Weapon Systems
    • Weapon Systems
    • Reports
No Result
View All Result
  • Home
  • Defense News
    • Defense & Geopolitics News
    • War Conflicts News
    • Army News
    • Air Force News
    • Navy News
    • Missiles Systems News
    • Nuclear Weapons
    • Defense Technology
    • Cybersecurity News
  • Military Photos
  • Defense Forum
  • Military Videos
  • Military Weapon Systems
    • Weapon Systems
    • Reports
No Result
View All Result
DefenceTalk
No Result
View All Result
Home Defence & Military News Missile News

Development of S-500 air defense systems behind schedule – paper

by RIA Novosti
October 5, 2011
in Missile News
1 min read
0
Russia to decide on sale of advanced missile systems to Belarus
56
SHARES
780
VIEWS

The development of Russia’s formidable S-500 air defense system is lagging behind schedule by at least two years, the Izvestia daily said on Wednesday citing a defense industry source.

According to the source, the first prototypes will be ready and tested by 2015, while the deliveries to the Russian army could start in 2017 at the earliest.

“The production cycle of this system is about two years. Therefore, even if the prototypes are ready by 2015, the military will not receive production models earlier than in 2017,” the source said.

A source in the Russian Defense Ministry confirmed that the earlier announced schedule of S-500 deliveries in 2015 was “too optimistic,” as the prototypes should have already been undergoing field tests to meet the deadlines.

The S-500, a long-range air defense missile system, is expected to become the backbone of a unified aerospace defense system being formed in Russia.

The system is expected to have an extended range of up to 600 km (over 370 miles) and simultaneously engage up to 10 targets.

The Russian military has demanded that the system must be capable of intercepting ballistic missiles and hypersonic cruise missiles and plans to order at least ten S-500 battalions for the future Russian Aerospace Defense.

Tags: air defensemissilerussiaS-500
Previous Post

Conventional Arms Transfers to Developing Nations, 2003-2010

Next Post

Eurocopter Flies First-Ever Hybrid-Engined Helicopter

Related Posts

Patriot missile defense system deployed in central Turkey

March 10, 2026

Turkey said Tuesday a Patriot missile defence system was being deployed in the centre of the country, a day after...

Japan to deploy counter-strike missiles closer to China

Japan to deploy counter-strike missiles closer to China

March 9, 2026

Japan will deploy a batch of long-range, counter-strike missiles in a southwest region near China by the end of March,...

Next Post
Eurocopter’s X3 Hybrid Helicopter Reaches Major Milestone

Eurocopter Flies First-Ever Hybrid-Engined Helicopter

Latest Defense News

US needs top cyber coordinator, better hacker ‘deterrence’

‘Digital fog of war’ around Iranian cyberattacks

March 13, 2026
US military says aircraft crash in Iraq killed 4 crew members

US military says aircraft crash in Iraq killed 4 crew members

March 13, 2026
Northrop Grumman moves to boost B-21 Raider output

Northrop Grumman moves to boost B-21 Raider output

March 13, 2026
US Navy evacuates virus-struck aircraft carrier Roosevelt

US military ‘not ready’ to escort tankers through Hormuz Strait

March 12, 2026
Israel cancels leave for combat units after Iran consulate strike

US says Iran campaign cost $11 billion in six days

March 12, 2026
US moves closer to retaliation over hacking as cyber woes grow

Cyberattack Disrupts Operations at MedTech Giant Stryker

March 11, 2026

Defense Forum Discussions

Loading RSS Feed
DefenceTalk

© 2003-2020 DefenceTalk.com

Navigate Site

  • Defence Forum
  • Military Photos
  • RSS Feeds
  • About us
  • Advertise with us
  • Contact us

Follow Us

No Result
View All Result
  • Home
  • Defense News
    • Defense & Geopolitics News
    • War Conflicts News
    • Army News
    • Air Force News
    • Navy News
    • Missiles Systems News
    • Nuclear Weapons
    • Defense Technology
    • Cybersecurity News
  • Military Photos
  • Defense Forum
  • Military Videos
  • Military Weapon Systems
    • Weapon Systems
    • Reports

© 2003-2020 DefenceTalk.com