Indonesia: 'green water navy'

Ananda

The Bunker Group

Well Naval News already confirmed Mete Han is Cenk 350N. Further information on FMP radar and sensors set up being explore in the article. Also today photo of FMP shown the the bridge module being installed.

FB_IMG_1764840190344.jpg

Photo from Keris FB.
 

Ananda

The Bunker Group

From local forum call indonesia defence review FB, shown the second OPV 90/98 KRI Lukas Rumkorem being flood out to begin sea trial. After launch last year, both OPV seems only waiting their Atmaca Missiles as their Aselsan Cenk 200N and others sensors already installed.

Add:
There's conflicting info on the radar, either Aselsan Cenk 200N or Hensoldt TRS4D. Will follow up later on this.

 
Last edited:

Ananda

The Bunker Group

Another video on KRI Lukas Rumkorem from local forum FB #Industri Made In Indonesia, conduct sea trial. Seems the builder crew on the trial taken a drone to do the video. Last part of the video shown it approach the heli pad with people supposedly the operator waiting.

I suspect the builder plan to delivered both OPV 98 together to TNI-AL soon.

FB_IMG_1764990511732.jpg
 
Last edited:

Ananda

The Bunker Group
FB_IMG_1765212663598.jpg

Photo edit from Keris FB account, shown FMP#1 already got penant number 322. Thus it will get sequel number from both PPA of 320 and 321. Potentially will use names from ancient kings, just like both PPA namesake.
 
Last edited:

Ananda

The Bunker Group

Video from builder Daya Radar Utama (Noahtu Group Shipyard) on both OPV 90/98 conducting sea trial together. The third sister ship already reach keel laying last month (already put it in this thread). The design depends on the rumours being told to already got approval budget allocation for at least another 5 to 7 OPV. The video put in X by local enthusiats forum member.

So Far MinDef seems open strategy to let selective yards to build couple corvettes or OPV each, and then decide which design they will further financing for more production. Seems this design already got backing for further production batches.
 

Ananda

The Bunker Group


Steel Cutting Qualification for Scorpene program, conducted couple days ago in PAL, under NG team supervision. This is basically part of trials process that NG done with PAL to test PAL facilities already meet NG standard for Scorpene fabrication.

The progress shown clossing steps of preparation wil not be that long, before fabrication stage begin.
 
Last edited:

Ananda

The Bunker Group

Attachments

Last edited:

Ananda

The Bunker Group
FB_IMG_1765720379659.jpg

From Keris FB on latest FMP#1 322 photo, taken today. She's ready to be launch. In my opinion PAL FMP#1 is in a bit more advance on fabrication stage if launch next week, compare Babcock Type 31 #1 (HMS Venturer). At least in comparison when launch.

HMS-Venturer-Float-off-3-1.jpg
 

Ananda

The Bunker Group

This video confirm all the scaffolding has been taken down. Seems the schedule for flooding out at 18th will be meet.


pretty impressive bit of shipbuilding in the time since steel was cut and the “keel” laid.
They have no choice to fasten the launch by end of this year, it is already behind 2 months from previous schedulle at Oct. They need the space for UAE and Phillipine LPD. PAL already promisses to launch the LPD's by next year. My understanding most modulles blocks already ready to be assembles. Only need space on the graving dock.

PAL taking more order that too close to their facilities capacities. Make schedulling very tight.
 

Ananda

The Bunker Group
FB_IMG_1765838134151.jpg

All the photo from Indonesia local enthusiast forum. VLS cells placement with cover for Arrowhead 140 derivatives the FMP#1. I'm certain the VLS cells has not yet installed, as Installment process will be after the launch. 8x8 cells if we looking at the covers, and it also seem confirm it will be Roketsan Midlas VLS.

FB_IMG_1765838054542.jpg

The A and B position also seem confirm it will be for Gun position, just as the online circulate picture of FMP shown. No missiles possition there, shown again all missiles will be at VLS cells in the middle.

IMG_20251216_064610.jpg

Asside for pennant number 322, seem this ship already have namesake. However the one that take picture carefully not try to focus on that, as no official announcement yet. Some enthusiats manage to digitally zoom to clear the name, however the photo owner carefully not using high HD picture. Still seems the name could be KRI Balaputradewa, a King from Sumatra Srivijaya empire that at hight rule Sumatra, Malaya Peninsula, Part of Java and Borneo. This empire rule at the same period with Chinese Tang empire.

Add, PAL official slide picture.
20251216_083411.jpg
 
Last edited:

Ananda

The Bunker Group
FB_IMG_1766016866906.jpgFB_IMG_1766016858483.jpg

Two product that PAL want to focus in the launching ceremony. FMP it self and KSOT UUV.

FB_IMG_1766016774637.jpg

Seems this will be the definitive prototype. The conformal torpedo tube on each side shown potential other conformal modules being attach. (Photo originate from an enthusiasts with id Badik).
 
Top