I think the justification... the run flats will get the troops out of sticky situation, and 40km is well and truly enough for that even if it is not enough to get them back to FOB etc meeting at a cleared point to change tyre... it will get them out of the situation that may have caused the flat or if they are in a fire fight etc. If that makes sense.Also interesting that they note the new vehicles have the ‘advantage’ of eliminating the spare wheel. The dubious justification is that all the tyres have run flats. While that is true, the run flats are only good for 40km at 40km/h, and still need to be changed pretty quickly if they are flat. I reckon I’ve probably changed about a dozen tyres on my own vehicle over the years, and I’m pretty lazy so I don’t do that unless I have to. I hope there aren’t too many rocks at Waiouru, otherwise the A echelon is going to be kept very busy supplying spare tyres.
I think the justification... the run flats will get the troops out of sticky situation, and 40km is well and truly enough for that even if it is not enough to get them back to FOB etc meeting at a cleared point to change tyre... it will get them out of the situation that may have caused the flat or if they are in a fire fight etc. If that makes sense.
To be honest I am only guessing...
It’s interesting they went for new builds in the end. I thought used vehicles were a done deal. In fact, last year I received orders to be prepared to hand over some of my unit’s vehicles to give to NZ.
Also interesting that they note the new vehicles have the ‘advantage’ of eliminating the spare wheel. The dubious justification is that all the tyres have run flats. While that is true, the run flats are only good for 40km at 40km/h, and still need to be changed pretty quickly if they are flat. I reckon I’ve probably changed about a dozen tyres on my own vehicle over the years, and I’m pretty lazy so I don’t do that unless I have to. I hope there aren’t too many rocks at Waiouru, otherwise the A echelon is going to be kept very busy supplying spare tyres.
The bushies were being trials just as I was leaving, to this day I’ve never seen inside one and have always wondered how the spare was mounted. Is it only a fixed hinges mount similar to the Mack 6x6 that can be lowered or raised with a bottle jack?
It’s mounted vertically on a fixed mount at the rear right just below the roof. The spare is lowered with a block and tackle.
We will see Rob come this September. I have a different take on the ascent of Crusher but that is straying into too much off-topic ....
It’s interesting they went for new builds in the end. I thought used vehicles were a done deal. In fact, last year I received orders to be prepared to hand over some of my unit’s vehicles to give to NZ.
Also interesting that they note the new vehicles have the ‘advantage’ of eliminating the spare wheel. The dubious justification is that all the tyres have run flats. While that is true, the run flats are only good for 40km at 40km/h, and still need to be changed pretty quickly if they are flat. I reckon I’ve probably changed about a dozen tyres on my own vehicle over the years, and I’m pretty lazy so I don’t do that unless I have to. I hope there aren’t too many rocks at Waiouru, otherwise the A echelon is going to be kept very busy supplying spare tyres.
What do we loose and what do we gain frrom going 5.5 rather than MR6 (aside from saving some cash-I wonder how much).
So the Bushmaster replaces the armoured Pinz, what will replace the standard Pinz? Are the standard Pinz even up for replacement?
So the Bushmaster replaces the armoured Pinz, what will replace the standard Pinz? Are the standard Pinz even up for replacement?
I thought the "missing" spare wheel was how the MR6 gained the extra internal space (and seating) so I guess it all comes down to what is more important, a spare wheel or a spare bod?
I'm sure on ops a wheel will be mounted on the roof or other such suitable space if deemed nescessary. Perhaps the 5.5 title is merely the term for the nz MR6 variant (ala NZLAV) as since they are new build I cannot see them veering too much off the baseline build line other than perhaps any nation specific add ons such as a nice shade of bronze green, a beefed up heater for Waiouru and some plus size cup holders for brew gears.
Don't think anyone has posted this yet. The Dec/Jan edition of Defence Technology Review has a two-page spread on the "NZ 5.5" model. Confirms deletion of the spare, higher gross weight axles and a surprising number of other tweaks. What I'm not clear on is how this varies from the MR6?
Not quite sure why you are comparing LAVs and Bushmasters, different Vehicles for different jobs. The main roles of the LAV is Recce, Fire Support, Escort, the Bushmasters job is basically as a Battlefield Taxi, replacing carrying Soldiers in the back of Trucks, delivering logistics to the frontlines. etc.How do these bushmasters compare in protection and troop mobility to say, the LAV 3? Will the LAV 3 not be getting a refresh or upgrade in light of this purchase? Are they still looking at selling those disused LAV 3 or keeping them? Up to thirty were mentioned here
Well the Aussies have had a good run with them in Afghanistan where they showed their worth and have proven themself... The V bottom is a major thing the LAV's don't have that directs the any blase away which protects the crew and passengers more.How do these bushmasters compare in protection and troop mobility to say, the LAV 3? Will the LAV 3 not be getting a refresh or upgrade in light of this purchase? Are they still looking at selling those disused LAV 3 or keeping them? Up to thirty were mentioned here
While it suggests replace with the line "a project will be initiated to consider how best to replace the NZLAV" my guess is with that budget it is more an upgrade program.From DCP-2019 page 37 said:Investment decisions planned for 2026
primary combat Vehicle
220. The New Zealand Light Armoured Vehicle has acted as the primary land combat vehicle of the New Zealand Defence Force since its introduction in 2003. The NZLAV has provided light armoured transport and combat capabilities. Following the introduction of protected mobility capability, a project will be initiated to consider how best to replace the NZLAV. The capability delivered will provide modern armoured projection and directed firepower to the New Zealand Army
Indicative dates:
Industry engagement commences – 2024
Request for tender – 2025
Introduction into Service – 2033
indicative capital cost:
From $300m–$600m