John Fedup
The Bunker Group
Hopefully soon! The faster Irving proves itself with the AOPS the better. It will make life easier when they start the much more complicated CSC project.
The CAMM cells are shorter than Mk 41, even than the self-defence length. They're half the length of strike-length Mk 41. So, to fit Mk 41 in place of CAMM launchers requires space under the CAMM launchers or a raised housing. How easy it is to make space available depends on what's there already. It's also additional topweight, quite high on the ship. T26 is supposed to have plenty of growth margin built in, so maybe that's OK.I would be quite interested to see how many Mark 41 cells the Type 26 can mount. I think they can fit 48 forward aligned like the CSC, and likely another 16 amidships where the CAMM cells are present on the UK version, ....
Yes, @Novascotiaboy is correct. It seems handover to the Navy is no longer "summer 2019", but now "late 2019".Mattshel
Speaking with a couple of contractors who work on the Dewolfe and their comments were that the vessel is behind schedule. There is lots of activity around the dock at Irving with two thirds of the future Margaret Brooke on the hardstand. Still no bow. The Harry Dewolfe still hasnt started sea trials and she has been in the water for over six months. Lets hope they can pull away soon.
Hi guys, I believe it is handover to the RCN. However, the only corroboration I could find is this article in Lookout magazine, which says she is "set for delivery in late 2019": Keel-laying marks another milestone for AOPS programYep, I hope something like a Vard 85 is selected for the future OPV. I guess the 57 mm guns from retired Halifax frigates could be a cost saving measure. I’m a fan of the 30mm Millennium gun.Should be on AOPS as well. I appreciate lead ship teething problems but almost a year after launch before sea trials begin seems somewhat long.
Perhaps not a Mistral, but maybe the HADR ship ("Purpose-converted peace-support ship") that is shown in the Platforms column on p. 58 of Leadmark 2050: http://www.navalassoc.ca/wp-content/uploads/2016/05/Leadmark-2050-13-May-2016.pdf.Hopefully, Irving gets through their production problems and QC issues with AOPS and when CSC is being built those kinks are all worked out and the workforce can crank them out on schedule and without many QC issues. I believe at this point in the program there should be a retrospective look at how the NSPS is functioning and if there are any issues that have crept up, it is always good for a 3rd party review of a program this large. It seems like the schedules for many of the ships are all over the place (Protecteur being built and then another ship in between the 2nd of class), it also seems that Irving was rewarded for having fallen behind schedule (AOPS 6), I understand the reasoning but it still seems like it was a reward of sorts. I also expect Davie to get some additional work moving forward either before or after the election. If the Liberals win they are going to offer a bone to them on top of the Icebreaker conversions and the Conservatives will for sure, if they win I foresee something like a Mistral or two built at Davie in pretty short order.
Perhaps not a Mistral, but maybe the HADR ship ("Purpose-converted peace-support ship") that is shown in the Platforms column on p. 58 of Leadmark 2050: http://www.navalassoc.ca/wp-content/uploads/2016/05/Leadmark-2050-13-May-2016.pdf.
Mattshelnyou beat me to the question of the recently announced Royal Navy sea bases.
Do those here see an opportunity for this very same type vessel in RCN service?
My choice is two JC/Canberra. Just as important they should be acquired the same way as Australia got theirs, hull done in Spain and finished off in Canada. Although I am not enthusiastic about Davie, a project like this is not unlike Asterix in some regards. Not sure if Irving can build vessels of this size and hauling a JC Hull all the way to Vancouver from Spain seems a pain. I guess if SeaSpan excels on the AOR builds, consideration for a total build of LHDs might be possible.
Leaving aside Irving competence, I think it could be more of a space limitation if one is talking about a build from scratch. I believe both Davie and SeaSpan have the space. Unless the government commits to more ships, keeping three yards open long term will starve them all eventually.
The CAMM cells are shorter than Mk 41, even than the self-defence length. They're half the length of strike-length Mk 41. So, to fit Mk 41 in place of CAMM launchers requires space under the CAMM launchers or a raised housing. How easy it is to make space available depends on what's there already. It's also additional topweight, quite high on the ship. T26 is supposed to have plenty of growth margin built in, so maybe that's OK.
Supposedly a big factor in RNZN's choice of CAMM over ESSM. Less topweight, and more space below decks once the Mk 41 launchers were removed.
Hard to imagine the (supposedly) lower whole-of-life cost of CAMM wasn't also a major consideration.
I was thinking of why the RAN version has the VLS cells in a 1 x 4 pattern yet the RCN version has a 1x3 and 1x1. I think it is because the RAN is only looking for a single version of the frigate but the RCN is looking for two variants, a GP version and an AAW version. Total guess here, but I think the GP version has 32 cells and the AAW version will have 48 cells, explaining the unusual change in arrangement on the Canadian version.