Can anyone shed some light on the GRF build, from other forum on the net it appears that they are running into massive problems in regards to emals/radar? Testing in small scale seems all right but on the large scale it seems to be drawing more power than anticipated and problems with moisture and current isolation and the cost blowout is having a detrimental effect not only on this project but has flow on to other project because of the cost overruns.
It seems like it’s the case of putting the cart before the horse, but with the ship construction nearly finished should they put the hull aside and start build JFK using the tried and tested Nimitz design till all problems are solved with the new concept and sea trials taken place to verify systems concept or is it a case of sticking with it and putting JFK on hold till problems are solved.
Navy Should Delay Next Carrier Amid Troubles, GAO Audit Says
Issues with new aircraft carrier could delay contracts with Huntington Ingalls | Business | The Sun Herald
Reverting to an older, less capable design is a step backward. Leave the engineers alone to fix the problems which are to be expected in a first-of-it's-class ship. The cost increases are also not a surprise. Just the GAO being auditors.