AUSTRALIA'S largest defence project, the $8 billion plan to build the navy's new air warfare destroyers, has had its first serious setback.
A Melbourne shipyard has botched the construction of the central keel block of the first warship.
The multi-million-dollar bungle could delay the project by up to six months and is believed to have triggered a rift between the Williamstown shipyards, where the hull block was built, and the warship's Spanish designer.
The setback has alarmed the Defence Materiel Organisation, which sees the AWDs as its flagship project and a key test of whether Australia can sustain a viable naval shipbuilding industry.
The three new 6500-tonne destroyers, based on the Spanish F100 boats, will be the most capable warships in the nation's history when they enter service from 2014.
The Australian understands that the central keel block of the first AWD warship, HMAS Hobart, was built to inaccurate dimensions as a result of faulty welding and inadequate quality control at the Williamstown shipyards, operated by an AWD subcontractor, BAE Systems Australia.
The AWD project manager, AWD Alliance, last night confirmed there had been "difficulties in the block fabrication" of the warship in Williamstown, which would affect production schedules.
"The difficulties cannot be attributed to a single cause but production start-up issues experienced by the shipbuilder, some difficulties in specific know-how and technical data have contributed," AWD Alliance told The Australian.
"The difficulties resulted in an unexpected distortion in a component of one of the blocks."
It said two other hull blocks were found to be at risk of distortion but the issue was identified and production processes were changed.
The distortion of the central keel block - which weighs about 200 tonnes, measures 20m by 17m and supports some of the most important heavy machinery on the warship - made it potentially incompatible with other blocks of the ship that are being built in Adelaide and in Newcastle.
One AWD source, who asked not to be named, said: "This is not a small problem - this is a major headache for us. This will have a ripple effect on the whole project because that hull block is critical, and if that block is delayed, then a raft of other things also get delayed."
BAE Systems Australia has been striving furiously for weeks to rework the faulty keel block to the correct specifications to get the project back on track.
A statement from the AWD Alliance, incorporating BAE Systems's response, said yesterday the distorted block had been "remedied by reworking" but said it was too early to say exactly what impact the problem would have on the overall AWD delivery schedule.
Sources have told The Australian that the project would be delayed by up to six months.
The AWD Alliance said it was looking at introducing extra shifts to try to make up lost ground.
BAE Systems won the $300 million contract to build 36 of the 93 hull blocks for the three new AWDs last year amid much fanfare from the Victorian government, which said it would create hundreds of new jobs.
BAE began work on the keel blocks early this year.
It is understood that BAE Systems believes the bungled central keel block was the result of what it considers to be inadequate design drawings provided by the ship's Spanish designer, Navantia.
Other AWD sources said this was unlikely because AWD hull blocks based on Navantia's drawings were also being built by ASC in Adelaide and by Forgacs near Newcastle, and work in those shipyards was progressing on schedule.
A spokesman for Navantia declined to comment yesterday.
The keel blocks are the most complex and important parts of the AWD hulls. Comprising up to 2000 pipes as well as electrical systems, they provide the foundation for the ship's gas turbine and diesel engine propulsion system. The AWD Alliance includes the government-owned Australian Submarine Project, the Defence Materiel Organisation and Raytheon Australia.
BAE's Williamstown shipyards were scheduled to begin shipping completed keel blocks to ASC in Adelaide in the first half of next year.
The AWDs will give a substantial boost to naval capability especially in anti-air warfare with its Aegis combat system allowing them to provide theatre ballistic missile defence over a wide area.
Fail BAE Fail...
That is rather disappointing. Presumably there are other issues the general public are unaware of.
Look up Ross Kelly and Whiteboards and you're have a good idea how the subcontracting of module builds for the AWD was decided.
I thought they got rid of the whiteboards, now you just make it up as you go along?
You do not have to be very upset from this problem in the keel block, it is normal to find some problems in the first ship of the batch, you are being transfered a design from a modern yard like Navantia, so what you are doing is not just to follow some drawings, but updating your yards way of work where rigour is very important. It´s normal to encouenter problems in the first ship, like in any other project.
this is another example of where the govt imposed australian industry content parameters into the project and the prime had to sub contract work to a company that was known to be sub standard in their work. Look at the early build grief with the Anzacs.
I said this 3 years ago - I would not let Tenix (now part of BAE) build a bathtub
An example...drainage holes in messdecks in the centre of a compartment...cause the ship doesnt roll at sea at all and doesnt have water flowing back and forth across the deck in a sea state...its sad the only way to keep the deck dry is mop and bucket because the drain doesnt collect water. The other one, absoloute pearler...when someone onboard an FFH uses a detergent or anything that could create suds...personnel stand clear GDP, Poo on deck...uhuh, the overflow pipe for sewage is on the main mast, which means GDP gets soaked in shit. In the GOA, this became a daily issue till we pulled all the crew up there to clean it one night, its so not cool when on watch. The issue is the pipe, and the sewage unable to deal with suds, pretty poor really. theres so many things we just look at onboard and ask, who thinks of putting that there? These are design and application problems that could have been solved early on, by someone looking into it and going "wait, thats just retarded, dont do that" instead they just know its no their problem and the navys now.
Concur,
Another classic example is how the flight deck is on an angle......down into the hanger AND there is no drain running across the entrance of the hanger, so when ever it rains the hanger floods......
OR
How the over engineered lift for moving food stores down and up from fridge flat runs just one deck, is too small for nearly every box, is a pain to set up to use and is so incredibly slow it NEVER gets used. On an ANZAC we store ship the same way they would of 200 years ago, 100% manually. Which I am sure you would all agree is not the best use of personnel on a minimally / critically manned ship.:hitwall
You cannot be serious? It is the centre keel.
That means that the maritime engineers and build engineers had a compromised dimensions plan.
this is so bloody basic it absolutely beggars belief. the fact that these idiots are trying to blame the spanish tech drawings is so inane that one must assume that they know how badly they have buggered up their elements.
again, the two other builders working off the same drawings have not had the same issues - that points to a competency issue.
I cannot believe that anyone would seek to trivialise this and think that its just a simple cut and shunt and all will be well.
Well, yes and no. It certainly points to problems in achieving dimension control in this particular case; but it is not quite so fundamental as that. The problem is correctable and will be corrected.
But Jaimito's wider point is valid. This is the start up block in the start up ship; world's best says one doesn't actually achieve repetitive production excellence until the fourth ship of a run so we would expect to be having some problems at this very early stage. Anybody who believes major projects such as this can be achieved without encountering, and overcoming, problems is dreaming.
spoz,
I've worked on various sub projects both here and overseas, I've also been involved with a series of light skimmers (OPV's). I've been involved in armoured vehicle programs, ballistic weapons programs and various turbine prohects including ring generators. I do have some idea about the intricacies of major platform builds
the fundamental issue is that BAE are blaming the Spanish drawings when the other 2 builders who are doing exactly the same work are not. The dimension planning cycle is not just about physical measurements, its about the dimension planning for the entire project.
This is not the first time that Willy yards have stuffed up a major build. They had a lousy reputation when I was overseas, and they have a lousy reputation in the current site because most of the old guard are still there.
At least Forgacs has learnt their lesson and fixed processes.
its not about production excellence hit by a 4th vessel which will never come - its about getting the processes right as far as possible on day 1
at an engineering management level one could raise any number of points about how quality and integrity control was being managed - and they are NOT unfair questions.
BAE blaming the spanish over the quality fo the drawings is too cute by half