Now if you were a sailor would you want to go to sea on a ship named after the ugliest women in two boots that NZ has ever had the misfortune to vote in as PM. I think we would have a mutiny.
That is a very good point Rob. Well done!
Now if you were a sailor would you want to go to sea on a ship named after the ugliest women in two boots that NZ has ever had the misfortune to vote in as PM. I think we would have a mutiny.
For the history of this deal Toby I refer you to these concise articles though we are heading off topic.
http://www.f-16.net/f-16_users_article14.html
and
http://www.f-16.net/f-16_users_article28.html
There were also reactivation costs of NZ$233m which the RNZAF were to pay as well as planned upgrades that were not part of the lease package that were to happen during the second 5 year lease period which LM would have benefitted from. Then a final a payment of NZ$287m at the end of the second lease period to purchase the aircraft outright.
This is outlined here -
http://www.victoria.ac.nz/css/docs/Strategic_Briefing_Papers/Vol.2 Feb 2000/C&C.pdf
It was going to be a win-win deal for all parties involved, RNZAF, LM, the US GAO, Pentagon, NZ Govt and White House however which way one slices and dices the figures.
Yes you are right. The cancellation was shameful and I can understand hurt feelings about it. I know a few good people whose careers were destroyed by it.
Lets get back to naval stuff.
Now if you were a sailor would you want to go to sea on a ship named after the ugliest women in two boots that NZ has ever had the misfortune to vote in as PM. I think we would have a mutiny.
I don't think mutiny is the way to go - I'd rather jump into the turning propellers than face a picture of Comarde Helen.
On another issue, what are the key issue facing the navy that the defence review has to deal with. My thoughts are...
1. The ANZAC upgrade and managing its cost.
2. How and what to we replace Manawanui, Endeavour with and
3. What maritime combat capabilities do we need in the post 9/11 world and an a factured Pacific.
I think for #1 the ANZAC upgrade will be limited to the bare basic's - ESSM, 2nd channel of fire and a limited sensor upgrade that deals with critical issues (i.e support for aging equipment etc). #2 has been addressed in part, previously on the board. I think 3 is going very tied to pacific / medium intensity operations, if it is addressed. I'm wondering if any one interested in a dumbed down ANZAC (No SPS-49, No ESSM but SeaRam and going back to the original plan to fit a 76mm)
It will be interesting to see whether RNZN is able to include this technology:
http://www.thalesgroup.com/australi...70204-0F18-343C-661E-5D3025785E02&type=Market
into her ANZAC upgrade. On the surface, it seems like a relatively easy way to include the much needed "multiple channels of fire" capability...
Fingers crossed (and it would be great for the RNZN ANZAC's to have a similar upgrade to the RAN ANZAC's)!
According to this recent news release, the RNZN ANZAC upgrade is priced out to be between NZ$287 and NZ$845 million for the two ships.
Unfortunately I suppose it all depends where the politicians draw the line i.e. bare bones upgrade versus something no doubt similar to the RAN's upgrade programme. Let's hope it's the latter, there's no point in the RNZN having ships that sitting ducks and not up to a full range of threat scenarios etc. Even the RNZAF's Skyhawks used to take out the ANZAC's regularly during exercises!
If they were getting the same upgrade as the RAN ANZAC's they would not be having their CWIS refurbished as the RAN ANZAC's no longer have the weight margin to operate a CWIS.
Lucasnz said:The New Zealand Herald is reporting that Rotoiti is to be delivered on Thursday 16 April and commissioned on the Friday.
The RNZN probably wouldn't operate Harpoon though-so there would still be room for a CIWS on board, unlike on RAN Anzacs.
Maybe yes, and maybe no...
The RAN Harpoon containers are immediately forward of the bridge, whilst the RNZN Phalanx is aft, above the hangar. Depending on how the weight distribution is laid out, there might still be an issue unless the weapon system is relocated and/or other equipment is re-arranged internally.
-Cheers
The New Zealand Herald is reporting that Rotoiti is to be delivered on Thursday 16 April and commissioned on the Friday. A few errors in the report, but at least they're starting to arrive. The OPV's are heading for mediation, with no confirmed delivery date. The full article is here.
I would still like to see them with a 25mm on the front.
Updated at 6:13pm on 17 April 2009
The Navy is formally taking possession of the first of four new $35 million ships on Friday
All four inshore patrol vessels, including the Rotoiti which is being handed over on Thursday, have been built in Whangarei.
The remaining three, Hawera, Pukaki and Taupo, are soon to be delivered.
Warrant Officer Steve Radley says the new vessel has specialist communications technology and is equipped with powerful spotlights, infrared cameras and fifty-calibre machine guns.
He describes the ship as "a bit of a Ferrari" which can travel at up to 25 knots, and stop within three-and-a-half times its own length.
Defence Minister Wayne Mapp says the completion of the small fast patrol ships marks the beginning of a new era in New Zealand's ability to patrol its coastal waters and economic zone.
He says minor faults in systems such as fire detection, which caused the ships to fail their initial Lloyds certification last year, have been ironed out.
Dr Mapp says the Government's defence review may lead to two more inshore patrol vessels being ordered.
the second ipv hawea is due in this week, tomorrow I think.Good to see the new ships starting to arrive