I did not realise that the VR has lost another 70-100 or so personnel in the last few years. Somehow we are going to have to arrest the decline and possible death of the VR. We clearly need to build numbers up as a priority. Well at least one IPV could work initially, other VR sailors training with the rest of the IPV fleet and maybe another IPV down the track as numbers and experience build up. By 2020 all IPV's with the VR.
The navy seems to be moving the VR towards a force made up mainly of ex regular personnel. Talking to a CPO I served with, he was saying that the RNZNVR now only have two enlistment dates for people of the street, and that people have to wait around (and therefore lose interest) before they are signed up. The main reason for this is that the individual units are no longer responsible for their own recuritment. At the same time the RNZN has finally allowed direct transfer to the VR from the RNZN (when I tried the writers just laughed at me - even though I quoted straight from the BR).
So Lucasnz your suggesting that the Wellington and Otago take on the roles of the Manawanui and Resolution by incorporating a standardflex modular system? Interesting - there is a certain cost effectiveness about it. It would save having to replace those two againg vessels sometime next decade. I think that a part-time survey / dive platform role is possible with modification, but I would need to be a little more detail about an MCM role - though I do understand with MCM technology changing it could be a part-time MCM support vessel. Is that what you are suggesting?
Yes. The space on the quarter deck of the OPV, along with the crane offers a wide range of options in relation to modular capability. The advantage of the modular capability, given the weight issues, is that removes the need for permanent fitting. The only significant change might be ensure that a suitable power supply was availabe and changes to allow module docking.
I agree the Danish L ships with their module system is the solution. They will give us the appropriate combat capability when we require it and also additional sealift capability. Two Absalon vessels with yet with 1 module per specialisation task and rotate the modules according to the required role. Would give us a third frigate equivalent. To think that this was what Phil Goff was thinking back in 2000.
My view is that the Thetis, with its 76mm and long range would be all we need for the majority of the events in the South Pacific, and could take the Southern Ocean duties off the OPV. I think you are correct in saying that we could buy two Absalom, with core weapons (127mm, ASW and 1 module of ESSM etc) and purchase the remaining equipment (Harpoon, 2 x ESSM, troop accomodation modules etc) for 1 ship only when a higher level of capability is required.
In terms of overall surface capability (ignoring the need for tankers, MRV's, IPV's and training vessels) in terms of a 3 x 3 capability. 3 Frigates (High intensity operations), 3 Absalom / LCS type vessels (Low / Medium intensity ops) and 3 OPV for Low intensity combat ops (Not just EEZ).
I think this structure reflects the type of operations NZ will be involved in the future where Medium / Low intensity ops will be the norm, while providing for the future.