Computer says no....
(Computer being the Government)
Lol, love the L-B reference...0% chance of a 4th
Computer says no....
(Computer being the Government)
Assuming that the 4th AWD was ordered to follow HMAS Sydney, I would expect delivery in 2019-2020, with the radar and computers not likely needed or install until about 2018, which is where I got the 2014 date from.
That schedule wouldn't fit into the current AWD build plan. The 4th AWD would be ready in mid 2018 if it followed right after #3. The delays thanks to the BAE thing might push that to the right but.
But the Govt. doesn't want it. They will try and keep shipbuilding alive between AWD and S5K with the SEA 1180, JP2048 Phases 4C and 5 builds.
All the Sir Bev's are well and truly paid off (For many years). Toby has had a very good run to last as long as she has, when she was worked as hard as she was.Properly and progressively maintained ships will last a long time. Tobruk under a commercially applied (enforced Class requirements) should have lasted a lot longer and should not have got into the state she was in if time was set aside to keep her maintained. The RFA LSL were first commissioned in 1967 and some are still in operation.
.
Ideally this is where NZ would order a Fridtjof Nansen class from ASC. However the chances of that are less than zero and of the order of ASC being tasked to build Nimitiz.
What about building 2 Fridtjof class ships, using them until the ANZACII are all online and then selling them onto NZ cheaply (perhaps initially only building 2 AWD to do so). NZ could then afford to purchase 3-4 ships (perhaps 1-2 Anzac II's). With another 2 AEGIS ships in the region resulting in a total of 5 for AN/NZ we would actually have a decent number to operate with. Fridtjof missile load out wouldnt be such an issue if ANZAC II has a full F-100 load out.
Seems like no enough thought was really put into this. The 4th awd is the only option that really makes sense. Trying to do a whole bunch of other local builds I fear will just cause headaches, building a variety of different types, possibly in a number of different yards is not the same as building the 4th of a single type.
Its not like there is no dollars available. 1-1.5 billion should easily be able to get us a 4th awd. All we are doing is prioritising sealift over capable air defence, of which we really don't have enough anyway to cover the sealift we have. Its going to make it harder for the local builds to succeed.
All the Sir Bev's are well and truly paid off (For many years). Toby has had a very good run to last as long as she has, when she was worked as hard as she was.
Of course when some future Government DOES want them for war-fighting duties, it will be all ADF's fault for failing to provide the "options" required...
You don't need air defence in exercises (it can be notional which is how the Australian Army mostly trains given the amount of capabilities it "notionally" has...) and you don't need air defence for humanitarian missions.
I don't think we'll see the ships do more than this, which is why the arguments about 4th AWD, STOVL fighters from the LHD's, superior weapons/sensor fitouts on the LHD's themselves and offensive fire support to support amphibious manueuver etc are largely futile, IMHO.
The Government of the day doesn't want them for warfighting missions. As long as they are sufficiently well-armed to stand a good chance of preventing themselves being bombed by suicide bombers or taken over by pirates, that will suffice. Anything else is superfluous...
Of course when some future Government DOES want them for war-fighting duties, it will be all ADF's fault for failing to provide the "options" required...
Well, some of these drugged up pirates attacked US cruisers and destroyers in the past...
And if a Tico doesn't frighten them a Canberra won't, too.
"The Press" are generally two-faced because stories with the theme "everything went well and according to plan" don't attract the statistics that get them paid (audience/advertisers). It is to their benefit to be seduced by a vested interest's agenda and not be too interested in motives.Having e AWD and 8 ANZAC is great but not if they are all buggered due to lack of maintenance where you end up throwing a lot of money at the ships to patch up or having to replace them post haste. If we did this the press wouel still say 'idle ships .... oh dear' but it doe have merit.
2RAR or 15 Somali pirates.... I know who I've got my money on![]()
A fourth ship in the triple cycle usually ends up being the ship which is cannibalized to sustain the other three. Once in a blue moon will you ever see the fourth ship, a second ship deployed abroad. That fourth ship still has to be maintained and crewed at considerable costs. For these reasons I said you don't get much more capability with an investment for a fourth ship. We are not talking about airplanes here with a handful of crew, destroyers have a crew of up to 200 personnel.
The pirates?
Its my opinion if you wish to deploy two abroad at the same time, you need six ships, not four.
The pirates?
I attribute this response to inter corps rivalry.
I attribute this response to inter corps rivalry.
I attribute this response to inter corps rivalry.