I'm personally convinced the next HMAS Melbourne will be one of the 'SSN-AUKUS' class, as we will take the American's lead on that tradition. That was settled in my mind as soon as HMAS 'Hunter' was announced.
We shall see...
As long as we're talking about things that annoy us - in no particular order:
- No Collins 7 & 8. Understandable, maybe, given the issues finding crews and possibly money, but regrettable. Beazley was right about them, if only because we'd now have more hulls to stretch out to 2045... Heck, we could have maybe finished number 8 just in time to start a Japanese submarine program from the same yard...
- No ANZACs 11 and 12. I know these were never planned, except for the potential NZ follow on order, but they should have been relatively cheap to add once that arrangement fell through. Another 2 ANZACs would be pretty useful about now. Also, why go to the expense of massive upgrades to our ANZAC 'patrol frigates' instead of a 2.0 batch with improvements from the start? I mean, Perth was completed only a relatively short time before the first radar upgrades, right? Couldn't we have gone for new built ships instead, and had a two-tier ANZAC fleet (GP Patrol and missile escort combatant)? I believe there may be a timing issue there, but maybe we could have kept all those workers in the shipbuilding industry...
- No OPV/OPCs after Malaysia pulled out. Why not? Did the need for a small, long range patrol combatant go away? After decades of trying to procure one? We were MORE worried about regional instability in the '90s.
- Also, why order the helicopters before the ships themselves? Do Seasprites take that long to refurbish? (turns out they do, lol)
- No 4th Hobart. Why go to the expense of setting up that operation for only 3 ships? Heck, why not just order them from Spain if there's only 3? We order other stuff from foreign yards - nothing to be embarrassed about. Heck, that's how we got the Perths! Anyway, what was the point? Are those AWD workers still in the shipbuilding industry?
- The entire Adelaide Class WIP thing was always weird to me. Why? To replace the Perths? How? And why so late? It should have been done in the nineties, if at all, surely? Why not order new hulls? The ANZAC program was over and AWD was still being planned, so there should have been capacity...
- Why not replace the Perths in the nineties, as they each hit 30? With more Adelaides, why not! Or an improved Adelaide, which is apparently what the Hobarts are... sort off... Come to think of it, why only build 2 Adelaides locally? That can't have been efficient.
- Why have a white paper in '08 or '09 calling for '8 large anti-submarine destroyers' and then do nothing about it for over a decade? And that's both parties in government, BTW. At the same time you have yards shutting down?
Oh, and while I'm at it - why upgrade the Darings but with no modern weapons? What was the point? The best radar-equipped pure gun-destroyer of the (missile age) '70s! To be fair, they looked fantastic...
100%
The further you go back the more stupid decisions you encounter, but are remakably consistant in the particular type of short sighted stupidity,
What makes it worse is it doesn't take much digging to discover the advice successive governments chose to ignore.
Some interesting tid bits.
Hermes was offered to Australia as an interim until a new Invincible class could be built or for outright sale, including refit. The cost of the sale plus refit to India, was reportedly less than it cost to upgrade Adelaide, Canberra and Sydney to operate Seahawk. This alone would have allowed the FAA to continue using SeaKing in the ASW role which in turn would have seen Ikara remain viable.
The UK offered a barter deal for Australia to build two additional LSH (Tobruks) for the RN/RFA in exchange for the UK building a new Invincible for Australia.
A repeat Ocean or SanGiorgio likely would likely have been cheaper than the Bill and Ben fiasco. These ships would have been smaller and cheaper than the later LHD acquisition, perfectly good enough, potentially in service before Bill and Ben were upgraded, and been viable to build in Australia. A second could have been ordered to replace Tobruk and maybe a third for aviation training and HDAR. Whichever yard did this work could have built new AORs instead of the Westralia and Sirius purchases, then built a Success replacement.
It's ironic how many times a perfectly good enough option was rejected because of the fear it would result in a delay or downgrading of another project, only for the feared outcome to occur anyway, without the mitigation of the perfectly good enough solution. One of the reasons given for not buying the Kidds was to pay for it two of the FFGs would have dropped from FFGUP .
Another concern is acquiring the Kidds would allow a future government to dodge building a proper one for one, more capable replacement for the Perths znd reduce tier 1 hull numbers from nine.