The Maritime Action Ship (BAM) is a modular type of vessel, adapted to different purposes on a common basis, to be manufactured by Navantia for the Spanish Armada.
The project
The Maritime Action Ship cover a niche somewhere between the corvettes and patrol vessels and surveillance. Its missions include patrol, protection of the exclusive economic zone as well as support and assistance interventions in third countries. Lightly armed Iran, will be capable of rescue and disaster assistance, hospital settings, material transport, combating marine pollution, and provide a platform for helicopter. Be constructed with civilian standards, except in certain aspects to be used in military standards.
On the one hand, his demeanor is similar to a corvette, which would give it the ability to provide wide autonomy, basic endowment house and transport personnel with a high degree of occupancy, stay at sea for long periods without subjecting staff to excessive fatigue, and have an Advanced Combat System based on Common Core of Scomber, with a high degree of interoperability with other Army units.
You are predefined types:
Patrolman ocean or high
Oceanography
Hydrographic
Diving Support
Intelligence Collector
Command and Support Ship (MCM)
The vessel will have a flight deck aft of the hangar (which will be integrated in the superstructure), with dimensions of 24.7 x 13.5 meters, which will launch operations, and refueling takes in hover and vertical supply of helicopters.
The BAM will be equipped with a high level of automation, notably through an integrated control system platform that incorporates all the advances in this field developed in recent years by Navantia for Navy ships.
The basic provision is to be built in quantity of 10 +6 options, while already under construction the first 4 units.
In principle, the patrol will replacing the class "Class Barceló", "Class Anaga", "Class Hutch", "Class Toralla" and "Discovery Class".
It is also envisaged that a BAM replace the oceanographic Las Palmas (A-52) and one to alert intelligence (A-111).
Units
In the first four ships were assigned the following names and numbers: [1]
BAM Meteorology (P-41)
BAM Lightning (P-42)
BAM Lightning (P-43)
BAM Tornado (P-44)
It is expected that these four first units entering service from 2010. [2] Its construction began on 4 October 2007 with the cutting of the first sheet. [3] and was placed on the stands the first on March 13, 2009 [4] in the shipyard San Fernando-Puerto Real
In June 2009, Secretary of State for Defense, the Congress confirmed the initiation of proceedings for the construction of a second set without specifying their number, but the navy expected to consist of between 4 and 8 additional units
General Characteristics
Displacement: 2,500 t (full load)
Length: 93.9 m
Beam: 14.2 m
Draft: 4.2 m
Armament: 1 cannon 76/62 mm
2 Mounting automatic 25 mm
2 × 12.7 mm
Propulsion: 2 diesel engines
4 groups diesel generators
2 electric motors propellers
1 Emergency generator
Located 2 cross bow thruster
Power: 450 BKW + 660 kWe + 750 kWe + 260 kWe + 500 kWe
Speed: 20.5 knots
Range: 8700 miles
Crew: 35 sailors
Strength: 35 (Marines and helicopter envelope).
Aircraft: 1 Medium Helicopter
Aircraft Equipment: apontaje platform aft
hangar
Images:
http://www.infodefensa.com/noticias/imgs/BAM1dentro.jpg
http://funkoffizier.files.wordpress.com/2008/12/bamconfiguraciones5ci2.jpg
photo:
http://i541.photobucket.com/albums/gg384/Orca-FdB/Cn16Octubre20090076.jpg
Video:
[ame=http://www.youtube.com/watch?v=jpLGL3igyg8&feature=PlayList&p=F4DBA11B6F1AC815&playnext=1&playnext_from=PL&index=19]YouTube - Botadura del primer B.A.M,clase Meteoro[/ame]
[ame=http://www.youtube.com/watch?v=HX_nAqhiaDs]YouTube - Botadura BAM METEORO[/ame]

The project
The Maritime Action Ship cover a niche somewhere between the corvettes and patrol vessels and surveillance. Its missions include patrol, protection of the exclusive economic zone as well as support and assistance interventions in third countries. Lightly armed Iran, will be capable of rescue and disaster assistance, hospital settings, material transport, combating marine pollution, and provide a platform for helicopter. Be constructed with civilian standards, except in certain aspects to be used in military standards.
On the one hand, his demeanor is similar to a corvette, which would give it the ability to provide wide autonomy, basic endowment house and transport personnel with a high degree of occupancy, stay at sea for long periods without subjecting staff to excessive fatigue, and have an Advanced Combat System based on Common Core of Scomber, with a high degree of interoperability with other Army units.
You are predefined types:
Patrolman ocean or high
Oceanography
Hydrographic
Diving Support
Intelligence Collector
Command and Support Ship (MCM)
The vessel will have a flight deck aft of the hangar (which will be integrated in the superstructure), with dimensions of 24.7 x 13.5 meters, which will launch operations, and refueling takes in hover and vertical supply of helicopters.
The BAM will be equipped with a high level of automation, notably through an integrated control system platform that incorporates all the advances in this field developed in recent years by Navantia for Navy ships.
The basic provision is to be built in quantity of 10 +6 options, while already under construction the first 4 units.
In principle, the patrol will replacing the class "Class Barceló", "Class Anaga", "Class Hutch", "Class Toralla" and "Discovery Class".
It is also envisaged that a BAM replace the oceanographic Las Palmas (A-52) and one to alert intelligence (A-111).
Units
In the first four ships were assigned the following names and numbers: [1]
BAM Meteorology (P-41)
BAM Lightning (P-42)
BAM Lightning (P-43)
BAM Tornado (P-44)
It is expected that these four first units entering service from 2010. [2] Its construction began on 4 October 2007 with the cutting of the first sheet. [3] and was placed on the stands the first on March 13, 2009 [4] in the shipyard San Fernando-Puerto Real
In June 2009, Secretary of State for Defense, the Congress confirmed the initiation of proceedings for the construction of a second set without specifying their number, but the navy expected to consist of between 4 and 8 additional units
General Characteristics
Displacement: 2,500 t (full load)
Length: 93.9 m
Beam: 14.2 m
Draft: 4.2 m
Armament: 1 cannon 76/62 mm
2 Mounting automatic 25 mm
2 × 12.7 mm
Propulsion: 2 diesel engines
4 groups diesel generators
2 electric motors propellers
1 Emergency generator
Located 2 cross bow thruster
Power: 450 BKW + 660 kWe + 750 kWe + 260 kWe + 500 kWe
Speed: 20.5 knots
Range: 8700 miles
Crew: 35 sailors
Strength: 35 (Marines and helicopter envelope).
Aircraft: 1 Medium Helicopter
Aircraft Equipment: apontaje platform aft
hangar
Images:
http://www.infodefensa.com/noticias/imgs/BAM1dentro.jpg
http://funkoffizier.files.wordpress.com/2008/12/bamconfiguraciones5ci2.jpg
photo:
http://i541.photobucket.com/albums/gg384/Orca-FdB/Cn16Octubre20090076.jpg
Video:
[ame=http://www.youtube.com/watch?v=jpLGL3igyg8&feature=PlayList&p=F4DBA11B6F1AC815&playnext=1&playnext_from=PL&index=19]YouTube - Botadura del primer B.A.M,clase Meteoro[/ame]
[ame=http://www.youtube.com/watch?v=HX_nAqhiaDs]YouTube - Botadura BAM METEORO[/ame]